Technical note

Technical reference — RC22 9/13 qualification snapshot

This localized note explains the scope and checks associated with RC22 9/13 qualification snapshot.
Author
Équipe HexaOS
Updated
6 August 2026
Published
Published

Purpose

This localized note explains the scope and checks associated with **RC22 9/13 qualification snapshot**.

Checks

Always verify the version, artifact, environment, expected result and return code.

Repeat after a restart when persistence or runtime state is part of the scenario.

Boundary

A packaged component is not READY; documented runtime proof is required for the exact artifact.

Current status

The complete 13-ISO line remains NO-GO: 9 editions are READY within their proven scope, 4 are PENDING, 0 failed, and no public download is open.